Assessment of Spanish secondary regulation market

I. Egido A. Baringo

March 2026 - October 2026

Funding entity Repsol Servicios Renovables, S.A


The main objective of this project is to analyze the performance of Repsol control area within the Spanish secondary regulation system (SRS), assessing the advantages and drawbacks of different configurations: (i) participation with one or two BSPs, (ii) integration of non-dispatchable renewable generation within the BSP, and (iii) integration of dispatchable renewable generation within the BSP


Layman's summary: Repsol performance in SRS: advantages and drawbacks of a single BSP, with and without renewable generation, or two BSPs.